PulseDNA

PulseFINE™: Compliance Acceleration
for Sovereign Nuclear Environments

Air-gapped AI compliance copilot for SMR developers and DOE-regulated facilities

Schedule Technical Review

NRC Licensing Documentation Is a Bottleneck

Safety Case Preparation

4–8 weeks

per cycle

Manual Traceability Mapping

100–300 hours

engineer time

Change Impact Analysis

2–5 days

per change request

Documentation Regeneration

1–2 weeks

after updates

Every delay compounds capital risk.

What PulseFINE™ Actually Is

Policy-Grounded AI Compliance Layer

An air-gapped, policy-grounded AI compliance copilot that converts regulatory documents into structured constraint graphs, grounds LLM outputs in those constraints, auto-generates traceable compliance artifacts, and operates entirely within facility infrastructure.

Not a:

  • • Anomaly detection platform
  • • Threat detection engine
  • • Predictive safety oracle

It is:

A compliance acceleration layer

How PulseFINE™ Works

1

Regulatory Corpus Layer

Transforms compliance from document search into graph traversal

  • •Safety basis documents ingested
  • •NRC guidance parsed
  • •DOE procedural manuals structured
  • •Converted into knowledge graph (requirements → dependencies → constraints)
  • •Version-aware tracking
2

Policy-Grounded Reasoning Engine

Prevents hallucinated compliance statements

  • •Retrieval Augmented Generation constrained by regulatory graph
  • •All outputs must cite: source paragraph, revision number, constraint ID
  • •Guardrails applied before generation, not after
3

Simulation Interface Layer

Where cycle time compresses

  • •Connects to facility digital twins
  • •Maps simulation outputs to compliance requirements
  • •Generates structured artifacts: safety case drafts, risk summaries, traceability matrices, change-impact reports
4

Deterministic Audit & Lineage Layer

Your real moat

  • •Logs: prompt, retrieved documents, model version, inference path, output hash
  • •Deterministic replay capability
  • •Human approval checkpoints
5

Air-Gapped Execution Layer

This is sovereignty

  • •On-prem GPU deployment
  • •No external control plane
  • •No telemetry exfiltration
  • •Hardware-aware model packaging
  • •Secure update process

Target Outcomes

Baseline (SMR developer typical)

  • •

    Safety case prep:

    4–8 weeks

  • •

    Manual traceability:

    100–300 hours

  • •

    Change impact analysis:

    2–5 days

  • •

    Documentation regen:

    1–2 weeks

PulseFINE™ Target

  • Traceability mapping:

    automated in hours

  • Change impact analysis:

    minutes

  • Artifact regeneration:

    same-day

  • Documentation prep time reduction:

    30–60%

Ready to accelerate your NRC licensing timeline?

Schedule Technical Review
Secured by Sectigo
base44
Edit with Base44